FAR 0.00% 50.5¢ far limited

SNE-2: rig arrival

  1. Ya
    6,809 Posts.
    lightbulb Created with Sketch. 3829
    Brief update:

    Top hole section was completed at SNE-3 yesterday and the Topaz mobilised to SNE-2 location at about 7PM. Drillship Athena joined it later on. Look fwd to an update on the depth the casing was run & set at. (At SNE-1 13" csg for the tophole was at apprx 1907mTVD).

    Attached is a map showing the path of Athena's mobilisation apprx 6.2kms north from SNE-3. Timeframe should b under 6 days for the tophole section dressage, before they drill on. Safe drilling.



 
watchlist Created with Sketch. Add FAR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.