FAR 0.00% 52.0¢ far limited

Brief update: Top hole section was completed at SNE-3 yesterday...

  1. Ya
    6,809 Posts.
    lightbulb Created with Sketch. 3829
    Brief update:

    Top hole section was completed at SNE-3 yesterday and the Topaz mobilised to SNE-2 location at about 7PM. Drillship Athena joined it later on. Look fwd to an update on the depth the casing was run & set at. (At SNE-1 13" csg for the tophole was at apprx 1907mTVD).

    Attached is a map showing the path of Athena's mobilisation apprx 6.2kms north from SNE-3. Timeframe should b under 6 days for the tophole section dressage, before they drill on. Safe drilling.



 
watchlist Created with Sketch. Add FAR (ASX) to my watchlist
(20min delay)
Last
52.0¢
Change
0.000(0.00%)
Mkt cap ! $48.05M
Open High Low Value Volume
52.0¢ 53.5¢ 52.0¢ $17.03K 32.56K

Buyers (Bids)

No. Vol. Price($)
1 10069 52.0¢
 

Sellers (Offers)

Price($) Vol. No.
54.0¢ 22471 1
View Market Depth
Last trade - 15.03pm 05/07/2024 (20 minute delay) ?
FAR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.