Snowy 2.0 boss says NetZero is ‘bullsh*t’, page-62

  1. 4,701 Posts.
    lightbulb Created with Sketch. 10
    Snowy Hydro is a LNP project, the study was finished in 2017 and LNP said the project will cost $3.8 billion.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.