Tunnel boring machine (TBM) Florence on Australia’s Snowy 2.0 hydro-electric scheme has now been stuck in place for four weeks. https://www.newcivilengineer.com/latest/snowy-hydro-2-0-tbm-now-stuck-for-four-weeks-12-06-2024/
imo they should have pulled Flo out of the hole that Broad had it stuck in and reassessed the geological path.
they made a bad mistake with this boring machine's position after reportedly ignoring the geological survey results. The new management's mistake seems to be they chose to stay with that course.
12 JUN, 2024 BY ROB HAKIMIAN