Snowy Scheme questioned ... Turnbul's back of envelope equivalent., page-5

  1. 25,091 Posts.
    lightbulb Created with Sketch. 72
    Andrew Bolt would be bound to say that wouldn't he the cost originally was put at $2 billion plus network cost of $1 billion ,I would spend money on that rather than the billions of hidden subsidies that are given to wind and solar that end up going overseas.
    The NBN was a dud due to lack of a sensible plan that ended up costing more than twice as much per connection as New Zealand.
    Last edited by logco: 21/12/17
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.