They must already have power lines in to have been operating so what benefit do they get from the $112 million extra they have spent
Plus the ARENA (The Australian Renewable Energy Agency ) will provide $13.5 million in funding towards the “Australia-first” project
And there are more cost to come
The plant will still only provide 60% of the power requirement
Although I believe that solar and windmills can assist in far flung places the economics must be the first consideration
This operation appears to have been a 100% political move with a lot of taxpayer money to achieve :::: nothing !
- Forums
- Political Debate
- Solar panels are a scam
Solar panels are a scam, page-142
-
- There are more pages in this discussion • 240 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Featured News
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online