Given the operator is locked into $78 or less, and th3 build figure has been given, I’d say that is all factored in.
If there are other figures I’d like to see them.
- Forums
- Science & Medicine
- SolarReserve granted approval for 150MW solar thermal project
Given the operator is locked into $78 or less, and th3 build...
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)