COE 2.22% 23.0¢ cooper energy limited

Sole Project, page-46

  1. 4,760 Posts.
    lightbulb Created with Sketch. 1236
    Not deluded, just wishful

    1. Practical Completion requires a demonstrated capacity to maintain stable supply of 68 TJ/d. However this was pre Phase 2 works.
    2. Phase 2 works are defined as to increase gas processing capacity, which will include the flexibility to reconfigure the two absorber vessels from a sequential to a parallel arrangement, cost of $19M (COE share $9.5M)

    Nameplate was 68TJ/day

    The reconfiguration could increase capacity to 74TJ/day (especially given the cost of works involved).

    Guess we will find out more in 2 days.
 
watchlist Created with Sketch. Add COE (ASX) to my watchlist
(20min delay)
Last
23.0¢
Change
0.005(2.22%)
Mkt cap ! $607.2M
Open High Low Value Volume
22.5¢ 23.0¢ 22.0¢ $799.1K 3.546M

Buyers (Bids)

No. Vol. Price($)
3 246047 22.0¢
 

Sellers (Offers)

Price($) Vol. No.
23.0¢ 1820182 16
View Market Depth
Last trade - 16.10pm 30/07/2024 (20 minute delay) ?
COE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.