Not deluded, just wishful
- Practical Completion requires a demonstrated capacity to maintain stable supply of 68 TJ/d. However this was pre Phase 2 works.
- Phase 2 works are defined as to increase gas processing capacity, which will include the flexibility to reconfigure the two absorber vessels from a sequential to a parallel arrangement, cost of $19M (COE share $9.5M)
Nameplate was 68TJ/day
The reconfiguration could increase capacity to 74TJ/day (especially given the cost of works involved).
Guess we will find out more in 2 days.
- Forums
- ASX - By Stock
- Sole Project
Not deluded, just wishful Practical Completion requires a...
-
- There are more pages in this discussion • 57 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add COE (ASX) to my watchlist
(20min delay)
|
|||||
Last
21.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $567.6M |
Open | High | Low | Value | Volume |
21.5¢ | 21.8¢ | 21.0¢ | $716.4K | 3.335M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
33 | 799832 | 21.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
21.5¢ | 215507 | 9 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
33 | 799832 | 0.210 |
15 | 679707 | 0.205 |
19 | 2136660 | 0.200 |
9 | 497688 | 0.195 |
8 | 742145 | 0.190 |
Price($) | Vol. | No. |
---|---|---|
0.215 | 215507 | 9 |
0.220 | 532832 | 18 |
0.225 | 353889 | 9 |
0.230 | 991574 | 8 |
0.235 | 639912 | 14 |
Last trade - 11.38am 08/07/2024 (20 minute delay) ? |
Featured News
COE (ASX) Chart |