    From the December quarterly production report (FMG):

    Cash costs per tonne:
    Operating cost of sales $38.01
    Operating lease $3.49
    Total direct costs $41.50

    As compared with the September quarter of total direct costs of $34.83 per tonne.

    The above are OPEX costs (current), i believe the costs in the table were estimated costs at time of their DFS???

    And that was for their current project of 40-55mtpa.
    Note they're ramping up to 55-155mtpa. CAPEX for this ramp up is $8.4 billion spend over 30months.

    Now with that in mind, i do believe SDL will have the ability with their original CAPEX to ramp up with a lower cost implication (though this is ages away and there is no point in speculating at this stage)
 