some details about highway 71 drilling

  1. 6,357 Posts.
    lightbulb Created with Sketch. 503
    1, existing net production of approximately 135 BOEPD

    2, first frac program was only on half way. which makes a considerable difference to the well's ability to flow

    3, its potential for improved flows was still very good.

    4, A further 14 metres of potential net pay has previously been identified at Merta #1 well in shallower Upper Wilcox and Cook Mountain sands - these will be completed and tested at a later date.

    http://www.oilvoice.com/n/Target_Energy_Commences_Production_at_Highway_71_Project_Texas/b9a88f7d3.aspx
 