Hi(ant1)
March 31st 2008.
North West Sector 47mlt DSO
Rockhole Bore 9mlt DSO
June 5th 2008. 56.2mlt DSO.
August 21st 2008 55.4mlt DSO.
A significant new zone of direct shipping buried cid mineralisation on five consecutive drill lines over a strike length of more than 2KM at Abalone,but this mineralisation has not been seperately modelled in this resource estimate as the hole spacing is too broad.Several in fill holes and drill traverses have been completed in this area but assay results for these holes are still pending.
Programmes of Sonic,Calweld and RC drilling are continuing at the Marillana Project to further extend the resource base and upgrade the current Mineral Resource inventory to the Indicated category.
October 22nd 2008.
DSO is still within (lower in fact than in March this year at 55.4mlt.
Yesterday they said 650 holes had been drilled.
October 15th 2007 Gravity Targets picture.
North West Sector MG1 47ml tonnes DSO.
MG2 about the same size target at Abalone.
MG3 Abalone twice as big as MG1.
MG4 slightly bigger than MG1 Abalone.
MG6 Abalone slightly smaller target.
Why no more DSO since March this year announced.
Regards
Westcott.
.
Add to My Watchlist
What is My Watchlist?