you are right mozart, the drill spacings were 300 mtrs from memory. not sure when the results are due, but they are probably amongst those that were mentioned earlier today in a post by someone as being due at about the same time as the quarterly.
I think the infill drilling will bring the spacing down to about 100 mtrs.
detrital beneficiation results are the turning point either way. The rest (inlcuding rail) are non issues if we have 1 Billion tonnes of saleable good grade ore.
We can build the rest from scratch as a worst case.
Add to My Watchlist
What is My Watchlist?