Here are production figures for Rio Tinto's Rossing mine in Namibia. In 2003 the average grade of ore produced was 348ppm or .0348%. This was not a cutoff, it was average grade over the whole year!
This is a uranium only mine and can show that cutoffs and average grades are dependent on the particular circumstances of the deposit, including mineralogy and mining technique. Molybdenum and rare-earths at Mt Gee are a positive factor that would work to lower cutoffs. The overiding factor controlling cutoffs is the price obtained for the product!!!
The last I saw, uranium is in a good uptrend.
http://www.rossing.com/2004performance.htm
All the best from the opalfields.
I hold mtn.
- Forums
- ASX - By Stock
- NRZ
- some more lies.
some more lies., page-4
-
-
- There are more pages in this discussion • 10 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NRZ (ASX) to my watchlist
|
|||||
Last
1.1¢ |
Change
0.001(10.0%) |
Mkt cap ! $20.92M |
Open | High | Low | Value | Volume |
1.0¢ | 1.3¢ | 0.9¢ | $112.0K | 9.997M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 206728 | 1.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.2¢ | 85000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 206728 | 0.011 |
7 | 2400500 | 0.010 |
5 | 990000 | 0.009 |
3 | 375611 | 0.008 |
3 | 3253968 | 0.007 |
Price($) | Vol. | No. |
---|---|---|
0.012 | 85000 | 1 |
0.013 | 10000 | 1 |
0.016 | 1529164 | 5 |
0.017 | 212562 | 3 |
0.020 | 200000 | 1 |
Last trade - 16.10pm 09/07/2024 (20 minute delay) ? |
Featured News
NRZ (ASX) Chart |