Only closer spaced drilling will prove anything - we obviously need closer spaced drilling starting from holes 1 and 2 which steps out at 100 metre or 200 metre intervals .. this time not looking for (hypothesised) far flung NW boundaries.
I'm sure that the area covering this particular tenement will remain the main focus.
- Forums
- ASX - By Stock
- CEO
- some perspective
some perspective, page-10
-
- There are more pages in this discussion • 98 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)