1. Was the panel constructed in 2008 operated successful?
2. What is it that sets the IP bought from CSIRO apart from other UCG companies? Can it be patented.
3. Does the mathematical model from CSIRO account for CSG operation in nearby seams.
4. What is the resolution of the Mathematical modelling that CNX applies to coal seams? What is the probability (risk) of variance from the model in real world construction and operation of UCG. Given that if panel 1 was not operated successfully this gives 100% probability of failure in the company's proof of concept thus far.
5. You stated that construction of a UCG panel had commenced in Chile. When did construction begin and does CNX have all necessary approvals in place to operate UCG?
6. What is the static ground pressure at 300 m below the surface? What is the range of temperature and pressure recorded upon ignition and operation of the UCG panel? What materials are used in constructing the pipes to withstand this range of temperature and pressure and phenomena such as ground subsidence?
CNX Price at posting:
32.5¢ Sentiment: None Disclosure: Not Held