That lower 35m section of the Baong Sands must b immaterial, hence the decision to plug back a bit further into the liner.
The gas readings for the Baong sands started increasing from 2776m (rep#9) & the plug is set at 2926m (last report).
So we are looking at apprx 150m gross thknss gas column in the Baong sands behind the 7" liner 2b perforated. How much of that is actually fractured with good permeability will matter more for the upcoming DST.
The cored section was from 2794-2807.4m (rep#10) with 1.04m missing due to possible fracture zone.
I hope they pick this as the first test section & then mayb another test interval somewhere lower, unless they want to save on costs by perforating majority of the reservoir section in 1 go.
Hope we get a gasflare this time around, unlike HS1's RTSTM or GTS.
- Forums
- ASX - By Stock
- MEO
- somebody please.
somebody please., page-17
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MEO (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online