Rob that drilling timetable you have is wrong.
Your assuming TLM have 1 rig operating, but in fact they have 2 or 3.
They have contracted the Parker 226 rig. They now own the Coral Sea rig after acquiring Rift Oil and I'm led to believe they are contracting another or bringing one from Indo.
Sepalosiphon and PPL 268 target will most likely be drilled in Jan and Feb, respectively.
- Forums
- ASX - By Stock
- something happening ?
Rob that drilling timetable you have is wrong.Your assuming TLM...
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NGE (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.12 |
Change
0.000(0.00%) |
Mkt cap ! $39.81M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 2616 | $1.10 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.13 | 19699 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 2616 | 1.100 |
1 | 10761 | 1.090 |
1 | 7609 | 1.055 |
1 | 15000 | 1.050 |
1 | 60000 | 1.030 |
Price($) | Vol. | No. |
---|---|---|
1.130 | 19699 | 2 |
1.190 | 1583 | 1 |
1.200 | 100000 | 1 |
0.000 | 0 | 0 |
0.000 | 0 | 0 |
Last trade - 11.00am 15/07/2024 (20 minute delay) ? |
Featured News
NGE (ASX) Chart |
Day chart unavailable