I think or rather I guess both 120Koz and 150Koz over 5 years are possible based on the known reserve. It is a matter of managing the mining of the higher quality U/G ores. To get to 120Koz, the mining of the Westralia U/G ore(4g/t) can be done in small scale and blended to the Jupiter O/P mine(1.3g/t) at the ratio of 1:20. ASIC will be lower in comparison to ASIC of 150Koz (at 1:6 ratio) production.
Must say the above is a guess since I am not in the mining industry.
DCN Price at posting:
39.5¢ Sentiment: Buy Disclosure: Held