GGE 0.00% 0.6¢ grand gulf energy limited

sonlite 2jan

  1. 3,469 Posts.
    lightbulb Created with Sketch. 1

    Desiree

    DETAIL
    01/02/2013 06 12755 LOGGED; TIH W/ 7 5/8" CMT RET TO 12278' ; SET 54 SX CMT PLUG F/ 12528-12228' ; INSTALLED DHT; RR 12/20/12; WOCR

    01/02/2013 05 10837 RAN FREEPOINT; SWABBED; STUCK DRILL PIPE @ 10191' ; ATTMPT TO FREE; TIH W/ CMT STINGER ASSY TO 7490' ; COND; WASH; TSTD BOP 12/19/12; SET CMT RET @ 2410' W/ TOC @ 2360' W/ 140 SXS; LOGGED; SET CIBP @ 2345' ; MILLED WINDOW FM 2323-2340' ; SET 2/S @ 2345' ; DRLD/SLIDE/ SURVEYED; RNG 7" CSG TO 9239'

    Apart from the stuck drill pipe (fixed) the main story is

    INSTALLED DHT; RR 12/20/12; WOCR

    The "tree" is installed and the rig has been released and

    Desiree is WOCR ; waiting on completion Rig.

    R15

 
watchlist Created with Sketch. Add GGE (ASX) to my watchlist
(20min delay)
Last
0.6¢
Change
0.000(0.00%)
Mkt cap ! $11.52M
Open High Low Value Volume
0.6¢ 0.6¢ 0.6¢ $825 150K

Buyers (Bids)

No. Vol. Price($)
12 8354193 0.5¢
 

Sellers (Offers)

Price($) Vol. No.
0.6¢ 1660368 1
View Market Depth
Last trade - 14.28pm 05/07/2024 (20 minute delay) ?
GGE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.