-
Share
3,469 Posts.
1
23/02/11
11:48
Share
KHALIQS
Your REVISED dates
"casing complete - 23.02.2011 assumin 1 week for
drill through to TD - 08.03.2011 based on 300ft per day"
They should be at at 12000 today - that leaves 4000
to TD @ 300 per day = 2 weeks = close enough 08.03.2011
The 1 Week assumption doesn't get there - but the answer is the same - so after all our chinese arithmetic -
15 mar looks good - with more casing on the way somewhere.
CHEERS
-