QPN 27.3% 0.8¢ quest petroleum nl

11670 feet drillDo we know at what depth the next casing will be...

  1. 2,721 Posts.
    lightbulb Created with Sketch. 104
    11670 feet drill

    Do we know at what depth the next casing will be

    Ive assumed casing at 12,000 ft and then drill down to TD

    So timetable i have is

    1200ft casing - 17.03.2010
    casing complete - 23.03.2010 assumin 1 week for
    drill through to TD - 08.04.2010 based on 300ft per day

    which is inline with the 50 day drill

    can anyone confirm or provid eany info on my estimates above
 
watchlist Created with Sketch. Add QPN (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.