NVX 1.82% 81.0¢ novonix limited

Sorry have to go, page-56

  1. 171 Posts.
    lightbulb Created with Sketch. 154
    What’s the groups thoughts on how many Gen 3 furnaces will be required to increase Riversides capacity to 20,000tpa

    Currently there’s 2 furnaces & associated equipment.

    My thoughts are another 2
    That would indicate each furnace has a production capacity of approx 5000tpa

    If that’s correct then 150,000t will require 30 furnaces,
    if Novonix have indicated to Harper they would be purchasing $280m in furnaces by 2030 that would suggest $9.3m per furnace which supports the overall project cost of $43m for the complete build & installation of the first 2 & all services & operating equipment as per the original project.

    I’ve posted this document previously but it’s always worth a read & some might not have seen it before.

    https://www.energy.gov/nepa/articles/cx-023777-high-efficiency-continuous-graphitization-furnace-technology-lithium-ion

    Back to my original Question of how many furnaces will be required to increase production to 20ktpa
    Is it 2 or more or status quo.

 
watchlist Created with Sketch. Add NVX (ASX) to my watchlist
(20min delay)
Last
81.0¢
Change
-0.015(1.82%)
Mkt cap ! $396.0M
Open High Low Value Volume
81.5¢ 82.0¢ 80.5¢ $890.2K 1.095M

Buyers (Bids)

No. Vol. Price($)
11 90451 81.0¢
 

Sellers (Offers)

Price($) Vol. No.
81.5¢ 552 1
View Market Depth
Last trade - 16.10pm 24/05/2024 (20 minute delay) ?
Last
81.0¢
  Change
-0.015 ( 1.82 %)
Open High Low Volume
81.5¢ 82.0¢ 80.5¢ 211149
Last updated 15.59pm 24/05/2024 ?
NVX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.