Bayswater, NSW has 4 gen sets of 660MW each. note that now, the evening peak, they are generating over 100% of nameplate. Not bad for 40 yr old stuff.
- Forums
- Political Debate
- South Australia fast-tracks 100 pct renewables target to 2027
South Australia fast-tracks 100 pct renewables target to 2027, page-90
- There are more pages in this discussion • 20 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Featured News
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non Executive Director
Simon Kidston
Non Executive Director
SPONSORED BY The Market Online