South Australia fast-tracks 100 pct renewables target to 2027, page-50

  1. 14,262 Posts.
    lightbulb Created with Sketch. 11
    You wouldn't know a fact if it bit you on the arse.

    There are NO transmission lines or interconnectors needed to keep the legacy system running if it were allowed to do as designed.

    Please stop the childish abuse, causes me to think you are STILL pooping your pants.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.