maybe like the anticlines/synclines at Bendigo and Bathurst area with up or down folding ?
mainly UG from Never Never lode with some base load to fill the mill from opencuts inc top of NN
Conceptualising guessing think of a leaning tower of Pisa 600 meters high as wide as a jumbo jet and guessing 20 meters thick and 2.7 times as heavy as water per volume then stick it underground .
Best to look at a presentation .
Guessing NN it will cost $170 a tonne to mine 25 a tonne to process ( inc TSF lifts) at cc 6.5 grams a tonne on ROM pad . High ounces per vertical meter which lowers sustaining capex per oz
They need more skill sets , that is normal plenty of contractors out there ie Barbinco, Develop etc .
- Forums
- International Markets
- Spartan Resources
maybe like the anticlines/synclines at Bendigo and Bathurst area...
- There are more pages in this discussion • 64 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SPR (ASX) to my watchlist
(20min delay)
|
|||||
Last
83.5¢ |
Change
-0.010(1.18%) |
Mkt cap ! $922.3M |
Open | High | Low | Value | Volume |
82.5¢ | 84.5¢ | 80.5¢ | $5.564M | 6.679M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
19 | 121337 | 83.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
83.5¢ | 70996 | 13 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
19 | 119373 | 0.830 |
8 | 62812 | 0.825 |
11 | 155442 | 0.820 |
2 | 14800 | 0.815 |
8 | 53490 | 0.810 |
Price($) | Vol. | No. |
---|---|---|
0.835 | 104379 | 18 |
0.840 | 292632 | 15 |
0.845 | 165703 | 12 |
0.850 | 485353 | 15 |
0.855 | 47316 | 7 |
Last trade - 15.43pm 14/06/2024 (20 minute delay) ? |
|
|||||
Last
83.0¢ |
  |
Change
-0.010 ( 1.44 %) |
|||
Open | High | Low | Volume | ||
80.5¢ | 84.3¢ | 80.5¢ | 213618 | ||
Last updated 15.59pm 14/06/2024 ? |
Featured News
SPR (ASX) Chart |