Complete testing should b at the end of the well NT.
Have been on wells where Operators flow them as u go, but these days Operators tend to b more cautious about downtime & stuff-ups. So they run logs when they reach casing point & then do conduct a DST at TD.
GDN will run a 2.75" production tubing on reaching TD (no DST with this rig) & get a smaller rig to the extended testing late Q2-'09 onwards.
cheers