regarding the 14% grades....andrew says they won't have to bother with them....the 23% grades alone will set them up for a 20 year mine life!!
he reckons they will look to produce between 2 and 3 million tons a year...and it will take about 2 years to get the whole thing to production.
in addition..though there is more up there it is apparently much deeper under the earth..whereas wonarah is easy to get at and close to the surface and whilst more people will jump on the bandwaggon like during the uranium upswing...mak will be the first off the blocks and is in am excellent position.
- Forums
- ASX - By Stock
- AEV
- spoke to andrew drummon this arvo
spoke to andrew drummon this arvo
-
- There are more pages in this discussion • 37 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AEV (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $21.14M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
AEV (ASX) Chart |
Day chart unavailable
The Watchlist
MTL
MANTLE MINERALS LIMITED
Nick Poll, Executive Director
Nick Poll
Executive Director
SPONSORED BY The Market Online