The geological continuity between drillholes mineralisation at the Halleck Creek project is controlled by batholith-scale fractionation. Hence, both empirical observations andstatistical analysis confirm a very high degree of continuity with the respective rock masses at Overton Mountain and Red Mountain.
It is this continuity of rock mass that allows the drill spacing and drill density pattern which is mostly irregular with drill spacing of approximately 200m to be used to establish an overall total measured, indicated and inferred resource size of 2.3B tonnes.
As for your question on JORC compliance, the updated Resource Estimates of the Halleck Creek Rare Earths Project" was compiled by ARR under the 2012 JORC code.
pjmac
- Forums
- ASX - By Stock
- Spotlight on American Rare Earths
The geological continuity between drillholes mineralisation at...
- There are more pages in this discussion • 717 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ARR (ASX) to my watchlist
(20min delay)
|
|||||
Last
28.5¢ |
Change
-0.005(1.72%) |
Mkt cap ! $145.5M |
Open | High | Low | Value | Volume |
30.0¢ | 32.0¢ | 28.0¢ | $322.7K | 1.079M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 21 | 28.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
29.0¢ | 21017 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
7 | 95802 | 0.280 |
6 | 96069 | 0.275 |
4 | 159109 | 0.270 |
4 | 127500 | 0.265 |
3 | 112145 | 0.260 |
Price($) | Vol. | No. |
---|---|---|
0.290 | 21867 | 3 |
0.295 | 45294 | 3 |
0.300 | 283374 | 3 |
0.305 | 6300 | 1 |
0.310 | 413300 | 3 |
Last trade - 15.34pm 30/04/2024 (20 minute delay) ? |
|
|||||
Last
29.0¢ |
  |
Change
-0.005 ( 1.29 %) |
|||
Open | High | Low | Volume | ||
30.0¢ | 31.5¢ | 28.5¢ | 567572 | ||
Last updated 15.59pm 30/04/2024 ? |
Featured News
ARR (ASX) Chart |