ARR 1.96% 25.0¢ american rare earths limited

Spotlight on American Rare Earths, page-3202

  1. 1,043 Posts.
    lightbulb Created with Sketch. 441
    The geological continuity between drillholes mineralisation at the Halleck Creek project is controlled by batholith-scale fractionation. Hence, both empirical observations andstatistical analysis confirm a very high degree of continuity with the respective rock masses at Overton Mountain and Red Mountain.

    It is this continuity of rock mass that allows the drill spacing and drill density pattern which is mostly irregular with drill spacing of approximately 200m to be used to establish an overall total measured, indicated and inferred resource size of 2.3B tonnes.

    As for your question on JORC compliance, the updated Resource Estimates of the Halleck Creek Rare Earths Project" was compiled by ARR under the 2012 JORC code.

    pjmac
    Last edited by PJMac: 19/02/24
 
watchlist Created with Sketch. Add ARR (ASX) to my watchlist
(20min delay)
Last
25.0¢
Change
-0.005(1.96%)
Mkt cap ! $123.3M
Open High Low Value Volume
25.5¢ 25.5¢ 24.5¢ $64.96K 259.9K

Buyers (Bids)

No. Vol. Price($)
3 50020 25.0¢
 

Sellers (Offers)

Price($) Vol. No.
25.5¢ 269615 2
View Market Depth
Last trade - 15.50pm 07/06/2024 (20 minute delay) ?
Last
25.0¢
  Change
-0.005 ( 0.00 %)
Open High Low Volume
25.0¢ 25.0¢ 25.0¢ 113088
Last updated 14.08pm 07/06/2024 ?
ARR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.