HUB SPP application date 13/11/20, expected sale date 04/12/20 =...

  1. 18,913 Posts.
    lightbulb Created with Sketch. 1208
    HUB SPP application date 13/11/20, expected sale date 04/12/20 = 20 days
    SN1 SPP application date 19/11/20, expected sale sate 04/12/20 = 13 days

    On this very small sample an average of 16.5 days
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.