**app three weeks -
As a result of the upper sections being carried out by a smaller drilling rig Cydonia will be able to confine the
necessary 24 hour operation of coring to approximately one week. It is important, from a safety perspective,
to provide continuous drilling operations when ?in coal ?. Gas is anticipated and it is critical that fluid
circulation and full well control is maintained throughout the coring cycle.
Overall the drilling program at a single location is not expected to exceed three weeks accumulated time.
Cydonia Resources Pty Ltd
ABN 68 137 806 181
Postal Address: P.O. Box 329, Kippa‐Ring, QLD, 4021, Australia
Phone (m) +61 (0) 407 508 791, Email: [email protected]
24 August 2010
Mr Michael Lloyd
Regional Environmental Officer
Environmental Sustainability Branch
Minerals & Energy Division
Industry & Investment NSW
PO Box 344
Hunter Region Mail Centre
NSW 2310
[email protected]
Dear Sir,
Reference: REF ? Clarence Moreton Resources P/L ? PEL 457 and PEL 479 ? Noise Control
Further to your communication with Mr Gillespie regarding the submission of noise control information as part
of the REF document I would like to provided the following information.
Noise Survey Results of Mindrill #7 Rig ? TDC Drilling Company
Date of Survey 06 August 2010
Survey Equipment: Digitech Sound Level Meter Model QM1592 complies with IEC 942 Class 2
Results: Results in dB (A weighted) and based on standard operating conditions. Primary noise
source is the rig motor. All measurements are based on distance from that source.
Location Results (dBA)
Rig Deck 97.6
End of pipe rack ‐ @ 5m 83.6
Far side of Mud Pump ‐ @ 200m 55.7
Open ground @ 200m 60.1
Back side of rig @ 500m 40.8
Pipe deck side of rig ‐ @ 500m 39.7
Off side pipe rack @ 500m 39.4
Well side of pipe rack @ 500m 40.3
These results are graphically illustrated over the page (Figure 1).
Figure 1;
Using the
at 400 m
Cydonia
on site R
being on
the drill s
Cydonia
design an
and offic
Furtherm
sensitive
The drilli
mitigate
installatio
that is on
Rig orientati
e same calcula
etres, being t
has only just
Rating Backgr
ly 400 metres
site, extending
Resources als
nd operations
es) being plac
more every ef
receptor.
ing program
the impact o
on of the con
nly 12 hours p
Cyd
Postal Addr
Phone (m) +6
on and noise
ations as desc
he distance to
concluded its
round Level in
s distant. Th
g out to 1400
so requires the
s managemen
ced on site to
ffort will be m
calls for a 24
of any noise
nductor, surfa
per day ? dayli
donia R
AB
ress: P.O. Box
61 (0) 407 508
levels at nom
cribed in the I
o the nearest
s land access a
nformation.
e remaining l
metres.
e contractor t
nt. This will re
act as a barrie
made to maxi
4 hour opera
generated Cy
ce casing and
ight hours.
Resourc
BN 68 137 806 1
x 329, Kippa‐R
8 791, Email: p
minated distan
nterim Noise
house is 37.5
agreement fo
The above ca
ocations nom
to take all rea
esult in the an
er to the nois
mize the dist
tion which is
ydonia has en
d intermediat
ces Pty
181
Ring, QLD, 402
pjackson@eiro
nces
Construction
7 (36) dBA.
or one site. A
alculation is p
minated in the
sonable steps
ncillary drilling
e.
ance betwee
s standard pr
ngaged a sma
e casing. Thi
y Ltd
21, Australia
online.com.au
Guideline the
s a result the
premised on
e REF are at a
s to attenuate
g installations
n the noise s
ractice for thi
aller drilling c
s work will be
u
e calculated n
re is an absen
the nearest
greater dista
e the noise thr
s (shacks, sam
ource and th
is type of act
company to u
e done on a s
noise level
nce of full
residence
ance from
rough site
mple sheds
e nearest
tivity. To
undertake
shift basis
Cydonia Resources Pty Ltd
ABN 68 137 806 181
Postal Address: P.O. Box 329, Kippa‐Ring, QLD, 4021, Australia
Phone (m) +61 (0) 407 508 791, Email: [email protected]
As a result of the upper sections being carried out by a smaller drilling rig Cydonia will be able to confine the
necessary 24 hour operation of coring to approximately one week. It is important, from a safety perspective,
to provide continuous drilling operations when ?in coal ?. Gas is anticipated and it is critical that fluid
circulation and full well control is maintained throughout the coring cycle.
Overall the drilling program at a single location is not expected to exceed three weeks accumulated time.
I trust this information is adequate for the completion of the REF. Should you have any queries please contact
the undersigned on 0407 508 791.
Yours faithfully
PHILIP JACKSON
General Manager
CC ? R Gillespie, D Thomson, TDC
- Forums
- ASX - By Stock
- ROG
- spud
spud, page-6
Featured News
Add ROG (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.8¢ |
Change
0.000(0.00%) |
Mkt cap ! $43.37M |
Open | High | Low | Value | Volume |
0.8¢ | 0.8¢ | 0.8¢ | $182.1K | 22.77M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
25 | 36939618 | 0.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.8¢ | 11435752 | 15 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
25 | 36939618 | 0.007 |
22 | 25864165 | 0.006 |
19 | 21446901 | 0.005 |
14 | 11649567 | 0.004 |
14 | 55199993 | 0.003 |
Price($) | Vol. | No. |
---|---|---|
0.008 | 9010720 | 14 |
0.009 | 15185141 | 38 |
0.010 | 41859744 | 46 |
0.011 | 17411415 | 21 |
0.012 | 17861981 | 19 |
Last trade - 16.10pm 08/11/2024 (20 minute delay) ? |
Featured News
ROG (ASX) Chart |
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online