ROG 0.00% 0.8¢ red sky energy limited.

spud, page-6

  1. 2,367 Posts.
    **app three weeks -

    As a result of the upper sections being carried out by a smaller drilling rig Cydonia will be able to confine the
    necessary 24 hour operation of coring to approximately one week. It is important, from a safety perspective,
    to provide continuous drilling operations when ?in coal ?. Gas is anticipated and it is critical that fluid
    circulation and full well control is maintained throughout the coring cycle.
    Overall the drilling program at a single location is not expected to exceed three weeks accumulated time.



    Cydonia Resources Pty Ltd
    ABN 68 137 806 181
    Postal Address: P.O. Box 329, Kippa‐Ring, QLD, 4021, Australia
    Phone (m) +61 (0) 407 508 791, Email: [email protected]
    24 August 2010
    Mr Michael Lloyd
    Regional Environmental Officer
    Environmental Sustainability Branch
    Minerals & Energy Division
    Industry & Investment NSW
    PO Box 344
    Hunter Region Mail Centre
    NSW 2310
    [email protected]
    Dear Sir,
    Reference: REF ? Clarence Moreton Resources P/L ? PEL 457 and PEL 479 ? Noise Control
    Further to your communication with Mr Gillespie regarding the submission of noise control information as part
    of the REF document I would like to provided the following information.
    Noise Survey Results of Mindrill #7 Rig ? TDC Drilling Company
    Date of Survey 06 August 2010
    Survey Equipment: Digitech Sound Level Meter Model QM1592 complies with IEC 942 Class 2
    Results: Results in dB (A weighted) and based on standard operating conditions. Primary noise
    source is the rig motor. All measurements are based on distance from that source.
    Location Results (dBA)
    Rig Deck 97.6
    End of pipe rack ‐ @ 5m 83.6
    Far side of Mud Pump ‐ @ 200m 55.7
    Open ground @ 200m 60.1
    Back side of rig @ 500m 40.8
    Pipe deck side of rig ‐ @ 500m 39.7
    Off side pipe rack @ 500m 39.4
    Well side of pipe rack @ 500m 40.3
    These results are graphically illustrated over the page (Figure 1).
    Figure 1;
    Using the
    at 400 m
    Cydonia
    on site R
    being on
    the drill s
    Cydonia
    design an
    and offic
    Furtherm
    sensitive
    The drilli
    mitigate
    installatio
    that is on
    Rig orientati
    e same calcula
    etres, being t
    has only just
    Rating Backgr
    ly 400 metres
    site, extending
    Resources als
    nd operations
    es) being plac
    more every ef
    receptor.
    ing program
    the impact o
    on of the con
    nly 12 hours p
    Cyd
    Postal Addr
    Phone (m) +6
    on and noise
    ations as desc
    he distance to
    concluded its
    round Level in
    s distant. Th
    g out to 1400
    so requires the
    s managemen
    ced on site to
    ffort will be m
    calls for a 24
    of any noise
    nductor, surfa
    per day ? dayli
    donia R
    AB
    ress: P.O. Box
    61 (0) 407 508
    levels at nom
    cribed in the I
    o the nearest
    s land access a
    nformation.
    e remaining l
    metres.
    e contractor t
    nt. This will re
    act as a barrie
    made to maxi
    4 hour opera
    generated Cy
    ce casing and
    ight hours.
    Resourc
    BN 68 137 806 1
    x 329, Kippa‐R
    8 791, Email: p
    minated distan
    nterim Noise
    house is 37.5
    agreement fo
    The above ca
    ocations nom
    to take all rea
    esult in the an
    er to the nois
    mize the dist
    tion which is
    ydonia has en
    d intermediat
    ces Pty
    181
    Ring, QLD, 402
    pjackson@eiro
    nces
    Construction
    7 (36) dBA.
    or one site. A
    alculation is p
    minated in the
    sonable steps
    ncillary drilling
    e.
    ance betwee
    s standard pr
    ngaged a sma
    e casing. Thi
    y Ltd
    21, Australia
    online.com.au
    Guideline the
    s a result the
    premised on
    e REF are at a
    s to attenuate
    g installations
    n the noise s
    ractice for thi
    aller drilling c
    s work will be
    u
    e calculated n
    re is an absen
    the nearest
    greater dista
    e the noise thr
    s (shacks, sam
    ource and th
    is type of act
    company to u
    e done on a s
    noise level
    nce of full
    residence
    ance from
    rough site
    mple sheds
    e nearest
    tivity. To
    undertake
    shift basis
    Cydonia Resources Pty Ltd
    ABN 68 137 806 181
    Postal Address: P.O. Box 329, Kippa‐Ring, QLD, 4021, Australia
    Phone (m) +61 (0) 407 508 791, Email: [email protected]
    As a result of the upper sections being carried out by a smaller drilling rig Cydonia will be able to confine the
    necessary 24 hour operation of coring to approximately one week. It is important, from a safety perspective,
    to provide continuous drilling operations when ?in coal ?. Gas is anticipated and it is critical that fluid
    circulation and full well control is maintained throughout the coring cycle.
    Overall the drilling program at a single location is not expected to exceed three weeks accumulated time.
    I trust this information is adequate for the completion of the REF. Should you have any queries please contact
    the undersigned on 0407 508 791.
    Yours faithfully
    PHILIP JACKSON
    General Manager
    CC ? R Gillespie, D Thomson, TDC
 
watchlist Created with Sketch. Add ROG (ASX) to my watchlist
(20min delay)
Last
0.8¢
Change
0.000(0.00%)
Mkt cap ! $43.37M
Open High Low Value Volume
0.8¢ 0.8¢ 0.8¢ $182.1K 22.77M

Buyers (Bids)

No. Vol. Price($)
25 36939618 0.7¢
 

Sellers (Offers)

Price($) Vol. No.
0.8¢ 11435752 15
View Market Depth
Last trade - 16.10pm 08/11/2024 (20 minute delay) ?
ROG (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.