TSV 0.00% 0.8¢ transerv energy limited

OK now that the bitch’n is over thought we might post on...

  1. 2,568 Posts.
    OK now that the bitch’n is over thought we might post on something more relevant.

    If TSV decide to go ahead with the squeeze job they will be able to achieve water free gas production rates up to 4.5mmcfpd from zones 3 to 6. How likely is the success of a squeeze job? Will it be a conventional squeeze job or something more advanced? Will this need to be performed each drill? How costly would it be? Thought I would throw these questions out to those who may know.

    One site talks about Cement Pulsation (advanced technique) on over 550 wells with a success rate of 95%

    http://www.gastechnology.org/webroot/app/xn/xd.aspx?it=enweb&xd=1researchcap%5C1_5eandp%5C1_5_5_whatsnew%5C1_5_5_1_gticementpulsationproduct.xml


    In my research I’m finding mixed views on the success of squeeze jobs however nothing about costs.

    To recap where we are at (from my understanding):

    Zones 1 and 2 – too much water
    Zones 3 to 5 – if water contained below contains net pay of 95m
    Zone 6 – was successfully plugged contains net pay of 20m
    Zone 7 & 8 – bonus zones discovered to be fracced contains net pay of 68m

    Looking at the above snapshot we're bloody lucky they came across zones 7 & 8!

    Cheers,

    Arkie






 
watchlist Created with Sketch. Add TSV (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.