"The horizontal interval to be drilled is the Wolfcamp A interval. We believe there are three and possibly four intervals which could be candidates for horizontal drilling over our leasehold position. Approximately 24 horizontal well locations have been identified for each interval. 72 to 92 horizontal wells in total could be drilled over the leasehold."
I like the sound of that !!