ssb's 2 big tips for 2003-42%&46%, page-7

  1. 1,047 Posts.
    Have done a bit of chasing down.

    Early proposal indicates, Pb-Zn shaft, and Copper Shaft in open cut, as well as the copper smelter....

    Long Section.

    http://www.mim.com.au/presentation.cfm?presentationID=18&slideID=359

    Whilst a birds eye view illustrates proposed position from a town area point of view.

    http://www.mim.com.au/presentation.cfm?presentationID=18&slideID=364

    Big question is will it be worth shifting the current operational shafts, and smelter......!
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.