Yes it was and the time line for the five stages was five years,...

  1. 18,311 Posts.
    lightbulb Created with Sketch. 1544
    Yes it was and the time line for the five stages was five years, Stage 5 being commercialisation.

    From what I can see, during Stage 4 a fully operational device will be tested firstly at a sheltered site, then at a fully exposed site.

    Stage 4 is forecast to be completed between 12 to 36 months after the start of the programme. That means commissioning would be in 2017, which is what they have forecast.
 