http://www.********.au/2016/12/14/why-galaxy-resources-limited-shares-have-gone-gangbusters-today/
MF must want to accumulate or just so dumb.
It takes 6 months if not more to just the commissioning right.
Then add in construction of 8-10 months. Design and resources?
Oh wells I will turn on the tap maybe there is enough lithium in the water supply.
- Forums
- ASX - By Stock
- Stay tuned...
http://www.********.au/2016/12/14/why-galaxy-resources-limited-sh...
-
-
- There are more pages in this discussion • 18 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)