The scope of this exercise is limited to the volume of rock between barn-burner holes BR-1-17 and BR-2-18. It is important to note that the following estimate is intended to capture just the tonnage and value created by the step out hole BR-2-18. The volume of rock represents just a fraction of the total mineralized area and the actual resource estimate 1H19 is likely to far exceed the estimates rendered below.
TONNAGE
Per the drill announcement, BR-2-18 was drilled 80m down dip and 50m down plunge from hole BR-1-17.
See excerpt from the announcement below:
BR-1-17 was drilled at -90° dip angle so the 64m intercept should be close to true vertical thickness. However, BR-2-18 was drilled at a -60° dip angle. To calculate true vertical thickness we can use basic function 64m * COS (60) = 32m. The blended average is 48m.
Therefore we assume dimensions as follows:
- 50m strike
- 80m lateral width
- 48m vertical thickness
As for density, I use the weighted average of sphalerite (3.6t/m^3) and barite (4.4t/m^3) which give me a specific gravity of 4t/m^3.
Tonnage is calculated as follows:
50m strike * 80m lateral width * 48m vertical thickness * density of 4t/m^3 = 768,000 tonnes
GRADE
You can see in the long-section below that grade continuity is excellent for at least 150m from BR-7-17 to BR-2-18.
However, for this exercise, we only care about how many tonnes and the value added therein as a result of this stepout hole.
BR-1-17: 8.5% Zn, 5.1% Pb, 374g/t Ag, 2.3g/t Au, 1.0% Cu
BR-2-18: 10.5% Zn, 7.7% Pb, 537g/t Ag, 4.4g/t Au, 0.9% Cu
Weighted average: 9.2% Zn, 6% Pb, 428g/t Ag, 3.0g/t Au, 1% Cu
POTENTIAL REVENUES
Input assumptions:
Throw it all in the blender and I get the following revenue per tonne mined for each of the three saleable concentrates:
- Zn Concentrate = US$175.14 per mined tonne
- Pb Concentrate = US$221.44 per mined tonne
- Cu Concentrate = US$109.93 per mined tonne
Total revenue per mined tonne = $506.51 per mined tonne
If we multiply by tonnage = $506.51 * 768,000t = $389M
- Forums
- ASX - By Stock
- Stepout hole BR-2-18
The scope of this exercise is limited to the volume of rock...
-
- There are more pages in this discussion • 57 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ADT (ASX) to my watchlist
(20min delay)
|
|||||
Last
$3.93 |
Change
-0.080(2.00%) |
Mkt cap ! $1.091B |
Open | High | Low | Value | Volume |
$4.02 | $4.05 | $3.91 | $4.364M | 1.107M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 14192 | $3.93 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$3.94 | 993 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 14192 | 3.930 |
2 | 11106 | 3.920 |
4 | 14480 | 3.910 |
8 | 38805 | 3.900 |
2 | 660 | 3.890 |
Price($) | Vol. | No. |
---|---|---|
3.940 | 993 | 2 |
3.950 | 511 | 1 |
3.960 | 511 | 1 |
3.970 | 511 | 1 |
3.980 | 5511 | 2 |
Last trade - 16.10pm 04/06/2024 (20 minute delay) ? |
|
|||||
Last
$3.94 |
  |
Change
-0.080 ( 1.73 %) |
|||
Open | High | Low | Volume | ||
$4.02 | $4.04 | $3.91 | 206233 | ||
Last updated 15.59pm 04/06/2024 ? |
Featured News
ADT (ASX) Chart |