OM#7 has successfully intersected production well OM#5 within the thick target Morley #2 coal seam after drilling a lateral length of 1035m. In light of the good drilling conditions within the Morley #2 seam, the lateral section was extended a further 115m to 1150m.
Add to My Watchlist
What is My Watchlist?