Seam
That being the case, the only explanation I could give would be why embark on a stage 1 of an LNG project with stage 1 reserves when you really hope and dream for something three times the size but dont have the reserves?
It would surely be nice to have them tucked away in the bottom drawer?
Dex
Add to My Watchlist
What is My Watchlist?