5GN 1.69% 14.5¢ 5g networks limited.

stokesbay, page-2

  1. 498 Posts.
    lightbulb Created with Sketch. 1
    Proposed Total Depth
    (measured KB): 2800 metres
    Prognosed drilling time: 15 days
    Spud Date: 0930 hrs, WST 3 October 2007
    Present Depth at 0600 hrs: 2755mMD
    Time of Reporting: 0600 hrs, WST 18th October 2007
    Operations Since Last
    Report:
    Since last report on Thursday October 11th, Stokes Bay-1 has
    been deepened from 1841mMD to present TD of 2755mMD.
    Stokes Bay-1 was drilled to a depth of 2589 metres at 1930
    hours on 15 October 2007, having intersected the original
    primary objective; the Carboniferous aged Anderson Formation.
    Subsequently, ARC Energy Limited (Operator) proposed to the
    EP 104/R1 Joint Venture that the well be deepened from 2589
    metres to approximately 2800 metres to evaluate the Upper
    Devonian aged Nullara carbonates. This recommendation was
    based on the favourable information gained from the recent
    Valentine wellbore and recognition that the Nullara carbonate
    reef level produces oil at Blina, and had strong shows in the
    nearby Point Torment 1 well. Parties electing to participate in the
    deepening operation and their respective equity levels in this part
    of the Stokes Bay-1 well (below 2589mMD) are:
    • ARC Energy Limited – 69.25% (Operator)
    • Emerald Oil & Gas NL - 12.75%
    • Pancontinental Oil & Gas NL - 10.0%
    • First Australian Resources Limited - 8.0%
    Page 3
    Interval to 2589mMD, (Full EP104 / R1 JV participation) :
    The well has encountered elevated mud gas and minor oil shows
    over the gross intervals 2455 to 2470mMD and 2510 to
    2535mMD in the lower Anderson Formation. On the basis of
    interpretation of data obtained from the low resolution Logging
    While Drilling (LWD) tools these intervals have indications of
    some hydrocarbon saturations. Further analysis and a possible
    testing decision will await higher resolution and more complete
    logging data to be acquired at the end of the well program.
    Interval 2589m to 2755mMD (participation by less than all
    parties) :
    In the past 24 hours, whilst drilling at a depth of 2755mMD, the
    well has encountered a total loss of returns indicative of
    penetrating a porous and highly permeable interval. Preliminary
    correlation indicates these losses occurred at or near the top of
    the Nullara Fm which is tentatively picked at 2722mMD (-
    2294mTVDSS); some 86m shallower than at Pt Torment 1.
    Efforts to control the fluid losses were successful, and when
    attempting to drill ahead at the same depth, mud returns were
    again lost to the formation. The losses have now been contained
    by the spotting of LCM across the interval below the Anderson
    Formation, and the well operation is POOH for logging and
    possible drill stem test to assess what fluids are present in the
    formation.
    Current Operations: Monitoring static well fluid losses prior to pulling out of hole for
    wireline logging.
    Hydrocarbon indications: Mud gas and oil shows as noted in the Anderson Formation.
    Comment: N/A
 
watchlist Created with Sketch. Add 5GN (ASX) to my watchlist
(20min delay)
Last
14.5¢
Change
-0.003(1.69%)
Mkt cap ! $44.26M
Open High Low Value Volume
14.5¢ 14.8¢ 14.0¢ $6.894K 48.07K

Buyers (Bids)

No. Vol. Price($)
1 62310 14.5¢
 

Sellers (Offers)

Price($) Vol. No.
15.0¢ 2129009 23
View Market Depth
Last trade - 15.31pm 19/11/2024 (20 minute delay) ?
5GN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.