3.9c
Impress Energy announces the following update on the Stormbird-1 exploration well in PEL 104.
Location 27 deg 34’ 49.16” S 139 deg 38’ 27.38” E
Spud Date 9 November 2008
Days since Spud 3
Current Depth (06:00am CST) 665m
Operations last 24 hrs Drill to 665 metres, POOH to run surface casing
Current Operations (06:00am CST) Run and cement casing
Forward Operations Install and test BOP, drill ahead
Total Depth 2280 metres
Add to My Watchlist
What is My Watchlist?