HIGHLIGHTS
„h Underground mining activities commence for the Eureka Bulk Sampling Program (EBSP) with stripping of the Western Adit.
„h Construction and site preparation for EBPS nearing completion.
„h Exceptional intercept of 0.35m @ 5,604 g/t Au from deep drilling at Eureka.
„h Eureka quartz reefs extended a further 50m below the previously defined down-dip extent of 300m.
„h Geological model quantifies 1.1 million tonnes of potentially highgrade quartz reefs to 300m depth at Tubal Cain.
„h Quartz reef tonnage per vertical metre at Tubal Cain more than double Eureka.
„h Surface drilling doubles the vertical extent of the Tubal Cain dyke bulge to 600m and increases the number of quartz reefs intersected from 8 to 15.
„h Visible gold seen in the majority of new reefs at Tubal Cain with initial results featuring peak reef grades up to 211.85g/t Au and 66.00g/t Au.
GDR
goldstar resources nl
HIGHLIGHTS„h Underground mining activities commence for the...
Add to My Watchlist
What is My Watchlist?