@mainholm @Jaded @gosouth etc
Can I enquire your thoughts on opex for SYR and KNL? Will leave it at those two as they have the most detailed and transparent information about their projects.
I see SYR in their feasibility have stated $286 AVERAGED over lom and will be on diesel for the first 5 years at least.
Strip ratio is .04:1 which seems hella low (?) and grade is avg of 16%
KNL has stated opex from year 1 of $570 and its not an average. Diesel power only for first 2 years. Strip ratio is 1:1 and grade is much lower at 9%
Haven't included other processing costs as I wanted to get the ball rolling....
Disc if it matters is that i hold knl but this is Siberia. Although u should consider changing the name as things are getting hot in here! Lol
- Forums
- Commodities
- Stratmin plots course for global graphite status
@mainholm @Jaded @gosouth etc Can I enquire your thoughts on...
-
- There are more pages in this discussion • 18 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Featured News
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online