HDR hardman resources limited

tiof 6 presence of oil column, page-38

  1. 2,241 Posts.
    lightbulb Created with Sketch. 2
    re: drillships Maybe so SG. Here's the whole of the Premier announcement.

    PREMIER OIL PLC

    (“Premier”)



    Mauritania Drilling Update

    Tiof-6 Appraisal well

    The “West Navigator” drilled the Tiof-6 appraisal well to a final total depth of 2696 metres where the acquisition of wireline logs commenced. Preliminary analysis of logs acquired while drilling and the wireline logs acquired so far indicates the presence of an oil column. At midnight on 10 January wireline logging was still in progress. Once logging operations are complete, the forward plan is to suspend the well to allow the rig to work on the Chinguetti development drilling programme before returning to flow test the Tiof-6 well.

    The Tiof-6 well is the 4th appraisal well following the two discovery wells completed in late 2003. The appraisal programme is proceeding on prognosis and the joint venture is planning to complete the test of the 4th appraisal well before refining development plans.

    The Chinguetti field, 25km to the south of the Tiof field, was given development approval in May 2004 and is on schedule for first production in early 2006 at approximately 75,000 barrels of oil per day (bopd), 6,000 bopd to Premier. Development drilling is currently underway. The Tevét-1 discovery well drilled in October 2004 is located within tie-back distance to the Chinguetti field.

    The “West Navigator” and “Stena Tay” drilling rigs will remain on location offshore Mauritania throughout the greater part of 2005, and will be drilling exploration and appraisal wells in addition to Chinguetti, and possibly Tiof, development wells.


    11 January 2005

    Cheers
    Zinc


 
watchlist Created with Sketch. Add HDR (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.