MLS 5.00% 1.9¢ metals australia ltd

A C N 0 0 8 9 8 2 4 7 41st Floor, 8 Parliament Place West...

  1. 20,449 Posts.
    lightbulb Created with Sketch. 268
    A C N 0 0 8 9 8 2 4 7 4
    1st Floor, 8 Parliament Place West Perth
    WA 6005
    PO Box 1618 West Perth WA 6872
    Tel: (08) 9481-7833
    Fax: (08) 9481-7835
    Email: [email protected]
    Website: www.austunitedgold.com
    20 November 2006
    The Manager - Companies
    Australian Stock Exchange Limited
    Exchange Centre
    20 Bridge Street
    SYDNEY NSW 2000
    Dear Sirs,
    STRONG POTENTIAL FOR LARGER RESOURCE
    AT THE MANINDI ZINC PROJECT
    HIGHLIGHTS
    • Down Hole Electromagnetics (DHEM) & Grade Modelling at both Warabi (Zone
    A) & Mulgara (Zone B) strongly indicates the presence of further mineralisation
    at depth.
    • Modelling shows that the resource positions at Warabi & Mulgara have been
    extended by recent drilling and have strong potential of continuing at depth.
    • The target areas generated from this modelling will be tested in the upcoming
    diamond drilling program.
    Metals Australia Ltd is pleased to announce the modelling of the Down Hole Electromagnetic
    (DHEM) program recently completed at Warabi (Zone A) & Mulgara (Zone B).
    Diamond drill holes were emplaced at the northern end of both Warabi & Mulgara to facilitate
    the DHEM program in September. The results of the DHEM and ‘grade’ modelling is as
    follows:
    1
    1. WARABI (ZONE A)
    The current JORC compliant resource at Warabi, utilising a 1% Zinc cut-off grade, is:
    119,350 t @ 8.42% Zn
    A single drill hole was emplaced to the west and adjacent to the northern extensions of
    Warabi main lode. This hole was then used to facilitate the DHEM survey. This survey
    successfully located a dipping conductor to the east of the drill hole in the target position
    shown on the attached diagram.
    A geological study of the ore system, which included long & cross sectional analysis,
    confirms this target area, which will be further tested by the upcoming drilling program.
    It should be noted, that despite the resource for this area having yet to be recalculated,
    recent drilling in this area has increased the physical size of this deposit, both to the
    north and at depth.
    Recent drilling by Metals Australia has included the following results:
    MNRC 008 664246E 6818038N 44-49 m 5m @ 11.8% Zn
    MNRC 014 664314E 6817997N 43-61 m 18m @ 14.96% Zn
    2. MULGARA (ZONE B)
    The current JORC compliant resource at Mulgara, utilising a 1% Zinc cut-off grade, is:
    218,240 t @ 7.77% Zn
    A single drill hole was emplaced to the east and adjacent to the northern extensions of
    Mulgara main lode. This hole was then used to facilitate the DHEM survey. This survey
    successfully located a dipping conductor to the east of the drill hole in the target position
    shown on the attached diagram.
    A geological study of the ore system, which included long & cross sectional analysis,
    confirms this target area, which will be further tested by the upcoming drilling program.
    It should be noted, that recent drilling in this area combined with the DHEM & grade
    modelling indicate that the ore system has a northerly plunge component and remains
    untested along strike, at depth.
    Recent drilling by Metals Australia has included the following results:
    MNRC 012 664174E 6818174N 23-39 m 16m @ 7.40% Zn
    MNRC 013 664211E 6818144N 82-92 m 3m @ 16.90% Zn
    2
    The grade modelling shown on the accompanying diagram shows the grades and drill hole
    ‘pierce-points’ on the main lode of each ore body, which contains the majority of the
    resource tonnage. The diagram is a slice along the long axis of the deposits, with north on
    the right hand side of the page.
    Warabi & Mulgara also contain a number of smaller/ discontinuous ‘footwall’ and ‘hanging
    wall’ lodes that add incremental tonnage to a mining scenario; these smaller lodes are not
    represented on the attached diagram.
    A program of diamond drilling is currently being planned to test the target zones delineated
    at Warabi & Mulgara, and should commence in either December 2006 or January 2007,
    subject to drill rig availability.
    KULTARR & KOWARI (ZONE D)
    The current JORC compliant resources at both Kultarr & Kowari , utilising a 1% Zinc cut-off
    grade, are: 715,060 t @ 7.46% Zn
    The interpretation and modelling of Kultarr & Kowari (Zone D) is currently being finalised and
    will be announced in the near future.
    Yours faithfully
    Metals Australia Limited
    Norman Grafton
    Company Secretary
    Competent Person Declaration
    The information in this report that relates to Exploration Results, Mineral Resources or Ore Reserves is based on
    information compiled by Timothy Putt of Exploration and Mining Information Systems, who is a member of The
    Australasian Institute of Geoscientists. Mr. Putt has sufficient experience that is relevant to the style of
    mineralisation and type of deposit under consideration and to the activity that he is undertaking to qualify as a
    Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results,
    Mineral Resource and Ore Reserves”. Timothy Putt consents to the inclusion in the report of the matters based
    on his information in the form and context in which it appears.
    3
    GRADE MODELLING
    & EM TARGET ZONE
    6818200 mN
    300 mN
    6818050 mN
    6818100 mN
    6818150 mN
    6818250 mN
    6818200 mN
    6818050 mN
    6818100 mN
    6818150 mN
    6818250 mN
    550 RL
    350 RL
    400 RL 400 RL
    450 RL 450 RL
    500 RL 500 RL
    6817900 mN
    6817950 mN
    6818000 mN
    550 RL
    300 mN
    6817900 mN
    6817950 mN
    6818000 mN
    350 RL
    MULGARA (ZONE B) INFERRED
    WARABI (ZONE A) FAULT
    APPROX SURFACE
    GRADE MODELLING
    & EM TARGET ZONE
    (AT PRESENT)
    119.794
    0.17832
    50.7
    7.8633
    MNRC013
    FRC037
    MNRC007
    0.892
    2.23
    0.0134
    60.77
    0.0286
    0.0289
    108.867
    186.7
    -0.0198
    38
    0.018
    269.28 59
    0.14
    3.77 1.78
    0.723
    94.373
    11.32 5.95
    2
    0.0276
    63.3732
    7.524
    181.455
    51
    90.92
    180.64
    96.8
    5.59
    118.4
    FRC008
    FWD004
    FRC030
    FWD002
    FWP001
    FRC028
    FRC007
    FWD005
    FWD007
    FWD001
    FRC027
    MNRC014 MNRC008
    FRC063 FRC012
    PH003
    FRC011
    FRC032 FRC035 FWD009
    FRC032
    FRC013
    FRC031
    FRC033
    FWD010
    FRC034
    FRC012
    FRC062
    FRC044
    FRC011
    FRC035
    MNRC012
    Author: TSP
    Office: Perth
    Drawing: EMIS
    Date:16/11/2006
    Scale: 1:1000 Projection: Non-Earth (meters)
    40
    METALS AUSTRALIIA LTD
    MANINDI ZINC PROJECT
    WARABI & MULGARA RSC
    MAIN LODE
    CONTOURED LONG SECTION
    (ZINC% METRES)
    0 10 20
    metres
    MLS Manindi LS (Zn% Metres)
    250 to 1,000 (1)
    100 to 250 (6)
    50 to 100 (8)
    25 to 50 (1)
    10 to 25 (1)
    5 to 10 (4)
    2.5 to 5 (1)
    0.5 to 2.5 (5)
    0 to 0.5 (7)
    -999 to 0 (1)
    6819000 mN
    6818500 mN
    6818000 mN
    666000 mE
    665000 mE
    666000 mE
    665500 mE
    665000 mE
    665500 mE
    664500 mE 664500 mE
    6819000 mN
    6818500 mN
    6817500 mN
    664000 mE
    663000 mE
    663500 mE 663500 mE
    664000 mE
    6817500 mN
    663000 mE
    6818000 mN
    FRC 018 81-94m 13m @ 0.27% Zn
    NUMBAT
    FWD 012 41.97-44.5m 2.53m @ 2.35% Zn
    NINGAUI
    FRC 018 81-94m 13m @ 0.27% Zn
    MNRC 015 71-74m 3m @ 1.00% Zn
    BANDICOOT
    Surface Sampling up to 444 ppm Zn
    MNRC 002 82-86m 4m @ 1.58% Zn
    603,130 t @ 7.66% Zn
    111,930 t @ 6.43% Zn
    KULTARR (Zone D Nth)
    KOWARI (Zone D Sth)
    MULGARA (Zone B)
    218,240 t @ 7.77% Zn
    QUOLL
    WARABI (Zone A)
    119,350 t @ 8.42% Zn
    Surface Sampling up to 620 ppm Zn
    MNRC 005 15-18m 3m @ 0.62% Zn
    M 57/227
    M 57/240 P 57/934
    P 57/935
    Author: EMIS
    Office: Perth
    Drawing: TSP
    Date:17/11/2006
    Scale: 1:8000 Projection: MGA Zone 50 (GDA 94)
    300
    MANINDI ZINC PROJECT
    CONTOURED SURFACE
    GEOCHEM WITH BOTH
    PROSPECT & RESOURCE
    LOCATIONS
    METALS AUSTRALIIA LTD
    0 75 150
    metres
    Manindi Geochem (Zn ppm)
    5,000 to 10,000 (4)
    1,000 to 5,000 (61)
    500 to 1,000 (94)
    250 to 500 (132)
    100 to 250 (230)
    50 to 100 (325)
    25 to 50 (587)
    0 to 25 (262)
 
watchlist Created with Sketch. Add MLS (ASX) to my watchlist
(20min delay)
Last
1.9¢
Change
-0.001(5.00%)
Mkt cap ! $13.44M
Open High Low Value Volume
2.0¢ 2.0¢ 1.9¢ $50.65K 2.665M

Buyers (Bids)

No. Vol. Price($)
3 724264 1.9¢
 

Sellers (Offers)

Price($) Vol. No.
2.0¢ 295242 5
View Market Depth
Last trade - 16.10pm 28/06/2024 (20 minute delay) ?
MLS (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.