Quick read & it looks as though they are hampered by unstable...

  1. 1,572 Posts.
    lightbulb Created with Sketch. 93
    Quick read & it looks as though they are hampered by unstable pit wall, and too small tailings dam. Awaiting approval for new tailings dam so they are on limited production that may be halted shortly. Whilst they remain waiting for approval, reduce or cease production price will continue to drop, but approval of tailings dam & increased production will lead to a rerate. Could be a good opportunity to average down.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.