CPV 1.11% 44.5¢ clearvue technologies limited

Studio Ten shows Clearvue technology, page-6

  1. 10,673 Posts.
    lightbulb Created with Sketch. 732
    That demo panel mustve been double glased, but for an actual Building installation they will use Triple Glased.

    You need to do your Own research so you know the Facts rather than you just making up lies purely because you know nothing about the Company or the Products.

    The triple Glased windows get 41% energy savings for heat and cold internal climate control of the building, but double glased would only get a 20% saving, so it wil be required as triple glased, also the extra pane of glass means the deflection flim is covered by the third pane, to make it Building integrated, if it was double glased the film inside would be exposed, so not optimal use of the tech.

    You just need to actually do your own research rather than spend your time posting Lies that you make up because your too lazy to research for the facts and then you would be able to post facts like I do on here.
    Last edited by ChippyDude: 19/06/19
 
watchlist Created with Sketch. Add CPV (ASX) to my watchlist
(20min delay)
Last
44.5¢
Change
-0.005(1.11%)
Mkt cap ! $109.4M
Open High Low Value Volume
44.5¢ 46.0¢ 44.5¢ $85.98K 192.0K

Buyers (Bids)

No. Vol. Price($)
1 9520 44.5¢
 

Sellers (Offers)

Price($) Vol. No.
46.0¢ 15740 2
View Market Depth
Last trade - 16.10pm 09/08/2024 (20 minute delay) ?
CPV (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.