CNJ 0.00% 0.1¢ conico ltd

Study on Arctic Mining in Greenland, page-55

  1. 4,362 Posts.
    lightbulb Created with Sketch. 1577
    Drilling at Mt Thirsty commenced 9th August as announced 9th August, so 5 or 6 drilling days have happened. On my calculations thats long enough to have drilled at least 2 holes to the target zone.

    Maybe just maybe we get announcement of visual sulphide in two holes at least Monday before open.
 
watchlist Created with Sketch. Add CNJ (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.