i dont post much on HC but you AZC lot seem better than the rest of the other HC posters so here is an email i recieved from the AZC CEO today.
"At the Mindarie Zircon Mine, we are in the process of commissioning the Mine Pump/Slurry Unit, and the Concentrator. We are expecting to be producing concentrates within a week, and at that time the Concentrate Upgrade Plant will be ready for commissioning also. By the end of the month the Mineral Separation Plant and Rail Loadout facility will be being commissioned. So by the end of the month we should be railing magnetic concentrates, and possibly some other products also. As you may have read, we have also commenced a pre-feasibility study on the WIM150 resource in Victoria
Full production is forecast to occur within the 1st 3-6 months, and cash inflows are forecast soon after delivery of product to the facilities at Port Adelaide."
enjoy!
- Forums
- ASX - By Stock
- substance
i dont post much on HC but you AZC lot seem better than the rest...
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AZC (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online